Article publishing
Home page > Article publishing > How much is the cement pile in Chongqing

How much is the cement pile in Chongqing

Release time: 2023-12-06 01:38:08
 How much is the cement pile in Chongqing

How much is the cement pile in Chongqing

Another is artificial intervention, which is called macro-control in economics. This is mainly the measures taken by relevant government departments when the commodity price fluctuates greatly during this period. Just like buying a house a long time ago, the house price is too high for most people to afford, so the government may need to take measures to regulate the house price to return it to a normal curve. Another possibility is monetary policy, which is mainly due to the fact that the central bank has carried out some regulation against the situation of too intense price fluctuations.

 How much is the cement pile in Chongqing

How much is the cement pile in Chongqing

1. Before putting the cement pipe into use, check whether the cement pipe is intact. If there are cracks, repair them in time. If they cannot be repaired, replace them. Do not use damaged or inferior cement pipes, which will affect the safety of the project. 2. The workers of cement pipe laying must have professional experience, the relevant departments should do a good job in supervision, and each procedure should be well controlled, otherwise the unqualified foundation in the early stage will lead to more problems in the later construction, and the problem should not be buried underground, because maintenance will consume a lot of human and financial resources. 3. When laying pipelines, the established construction scheme shall be strictly followed, and do not make decisions or cut corners, otherwise the project quality will not be guaranteed. 4. After the cement pipe is laid, the special quality inspection department shall further review it to ensure the project quality.

 How much is the cement pile in Chongqing

How much is the cement pile in Chongqing

The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application. The application of electric oil pump must refer to the manual of electric oil pump. In case of use, the requirements in the key main parameters should be followed very well. Do not be overweight. After arriving at the travel arrangement, pressure should be applied. Otherwise, when the height width ratio of lifting or the lifting tonnage exceeds the requirements, the top of the hydraulic cylinder may have serious oil leakage.

 How much is the cement pile in Chongqing

How much is the cement pile in Chongqing

Before the cement pipe is laid down, the elevation of the pipe top shall be controlled with a level gauge. The pipes shall be arranged from low to high. The pipes shall be placed in place and then corrected manually with excavator. The socket and spigot shall face the upstream direction, and the inner wall of the socket and spigot shall be coated with washing water, so that the rubber ring can slide in smoothly when inserting pipes and facilitate installation. In addition, the cement pipes passing the installation inspection shall be backfilled immediately, and the pipes with larger specifications shall be backfilled to at least one time the pipe diameter above the pipe top to ensure that the cement pipes can avoid directly loading the ground pressure. After backfilling, the ground shall be cleaned. In this way, the laying of a cement pipeline can be completed, and a complete underground pipeline system can be officially put into use, making its due contribution to the environmental protection construction of the city.