Article publishing
Home page > Article publishing > Jiangxi cement pile price

Jiangxi cement pile price

Release time: 2023-12-12 01:37:46
 Jiangxi cement pile price

Jiangxi cement pile price

5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.

 Jiangxi cement pile price

Jiangxi cement pile price

The cracks on the surface of cement pipe are mostly caused by folding, and the key can be divided into two categories: one is caused by the evaporation and hardening of the water on the surface of cement pipe during rigid concrete pouring. Generally, the average external temperature of cement pipe during rigid concrete pouring is high, while the air humidity in the air is low, so the surface will volatilize and dry, but the interior is still plastic, This causes cracks. The other is caused by the temperature difference between the inside and outside of the concrete caused by the water cement ratio when the cement pipe is hardened. For deeper cement pipes, the foundation will continue to settle due to its own weight during the whole process of concrete pouring of the top cement pipe. When the cement pipe is exposed to building reinforcement or the connecting anchor bolt of the template and other items just before the final setting but not before the final setting, this kind of foundation settlement will be blocked and will immediately cause cracks.

 Jiangxi cement pile price

Jiangxi cement pile price

Principle of pipeline well crossing method: when the cement pipeline meets the crossing of existing pipelines or rainwater and sewage pipes during burial, the pipeline well crossing method is adopted, which can reduce the buried depth of the pipeline and is not easy to block. An inspection well shall be set at the intersection of pipelines to let another pipeline pass through the well. The key is to ensure that the water flowing area in the well (the area of the shadow part in the figure) is greater than or equal to the sectional area of the pipeline to be passed through. The size of the water flowing area in the well can be controlled by the size of the pipe passing inspection well. The principle of pipe passing is small pipe passing through large pipe, and the current pipeline passing through the planned pipeline.

 Jiangxi cement pile price

Jiangxi cement pile price

Solution to surface crack of cement pipe. First of all, we should reasonably control the temperature raising speed inside the cement pipe. We can add appropriate mineral ash in the production of cement pipe to ease the release rate of water binder ratio; Secondly, by controlling the temperature of raw materials, we can select a condenser inside the cement pipe structure to cool the circulating water and release the specific energy of water glue. When cracks have already appeared, people usually paint cement mortar or low viscosity polymer for sealing to avoid water intrusion; If the crack is deep or wide, the working pressure grouting shall be used for technical repair. In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column.