Shenyang cement pipe price
When planning the cement pipeline system, the slope of the cement pipeline above the overflow water level should be minimized to reduce the length of the ponding pipe section and the amount of ponding in the drainage system. The slope of the cement pipeline below the overflow water level should not be too small, and it should be ensured that the water flow has a certain scouring strength on the pipeline when the pipeline is evacuated. This method is applicable to the control point of the cement pipeline which is close to the access point of the municipal cement pipe network. If one method is adopted, the cement pipeline in the community cannot be connected to the municipal pipe network, and the residential community or factory area with small scale is also applicable to the rainwater drainage system. When used in the rainwater drainage system, rainwater is discharged through overflow wells. The rainwater pump is only opened after each rain and when the pipeline needs to be dredged and maintained, so as to remove the accumulated water in the pipeline.
Shenyang cement pipe price
In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column. The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application.
Shenyang cement pipe price
Precautions for installation and connection of cement pipe 1. The newly welded joint can be corrected within the specified cooling time, and a small amount of rotation is allowed. However, after the cooling time, forced correction is strictly prohibited. Note: The connected pipes and pipe fittings shall not be inclined. They shall be basically horizontal and vertical to avoid incorrect angle when installing the faucet. 2. It is forbidden to let the newly processed joint bear external force within the specified cooling time. 3. When PP-R pipe fittings with metal threads are used, the white raw material tape must be firmly sealed to avoid water leakage from the threads. 4. When overtightening PP-R pipe fittings with metal threads, the pipe fittings may be cracked, resulting in water leakage. Pay attention to the appropriate force.
Shenyang cement pipe price
The bending resistance of thin-walled pipe piles is poor, especially the poor shear resistance and tensile resistance of the pile body, which has buried hidden dangers in the foundation of the building. Therefore, some national prestressed concrete pipe pile research meetings have clearly sent out information that the shear resistance and tensile resistance of pipe piles should be specified, and pipe piles should be carefully used in key projects, At the meeting, various experts demonstrated and looked forward to the pile type with square or polygonal external surface, hoping that China could move closer to the western developed countries and develop the foundation pile material with polygonal or variable diameter external surface. The prestressed concrete hollow square pile was developed for this purpose.
Shenyang cement pipe price
Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.
Shenyang cement pipe price
5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.