4) When mixing and sinking, start the rotary table of the deep mixing pile machine. When the speed of the mixing head is normal, the drill pipe can be mixed while sinking along the guide frame. The sinking speed can be adjusted by the gear, and the working current should not be greater than the rated value. 5) When the grout is mixed and lifted and sunk to the design depth, start the mortar pump, send the grout through the pipeline to the grout outlet of the mixing head, start the mixing pile machine and tighten the chain device after the grout is discharged, and lift the drill pipe while spraying and mixing according to the designed lifting speed (0.50~0.8m/min) to fully mix the grout and soil. 6) Repeat mixing and sinking. After the mixing bit is lifted to 500mm above the pile top, turn off the mortar pump, repeat mixing and sinking to the design depth, and the sinking speed shall be in accordance with the design requirements.

 Hebei cement tank manufacturer

Hebei cement tank manufacturer

The newly developed hollow square pile has completely overcome this disadvantage by combining centrifugal and prestressed technology with internal hollow. In the market, prestressed concrete pipe piles are used more frequently in industrial and civil buildings. They overcome the shortcomings of the previous pile types and have their own characteristics, but the disadvantages are also obvious: the appearance is smooth and round, especially when used as friction piles, the friction force with soil is small, and many projects have to use pipe piles with large outer diameter or simply use solid square piles, Increased project cost; The bending resistance of thin-walled pipe piles is poor, especially the shear resistance and tensile resistance of the pile body, which has buried hidden dangers in the foundation of the building

 Hebei cement tank manufacturer

Hebei cement tank manufacturer

Compared with other pile types, especially prestressed concrete pipe piles, hollow square piles have the following outstanding advantages: ① large surface area and square or polygonal angle, the angle of repose between the pile and the soil in the soil layer is much larger than the circular surface, which means that hollow square piles can obtain greater bearing capacity than pipe piles under the same geological conditions, saving a lot of foundation funds for the project; ② By comparison, the bearing capacity of 350 hollow square piles is equivalent to that of 500 outer diameter thick wall pipe piles, and the cost per KN bearing capacity is lower than that of prestressed concrete pipe piles, which means that designers can select square piles under the same design bearing capacity, while the market price of 350 hollow square piles is less than that of 500 outer diameter thick wall pipe piles, which can save a lot of material costs;

 Hebei cement tank manufacturer

Hebei cement tank manufacturer

1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.   

 Hebei cement tank manufacturer

Hebei cement tank manufacturer

1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.