Article publishing
Home page > Article publishing > Jiujiang Cement Pile

Jiujiang Cement Pile

Release time: 2023-12-20 01:37:34
 Jiujiang Cement Pile

Jiujiang Cement Pile

Before application, be sure to check whether each part is normal, and ensure the safety factor of each rubber hose connection. With the continuous and sustainable development trend of cement pipes and the increasing number of applications, problems such as pipeline leakage of cement pipes due to design, production and manufacturing or lack of maintenance have arisen. This has seriously affected the product quality of cement pipes and threatened everyone's personal safety. Therefore, we must strictly inspect the cement pipes in the whole process of application, so that we can see what problems are likely to occur in the whole process of application of cement pipes.

 Jiujiang Cement Pile

Jiujiang Cement Pile

In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column. The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application.

 Jiujiang Cement Pile

Jiujiang Cement Pile

Main purpose of cement pipe. 1. It is generally used for drainage pipes of rainwater and sewage in cities and towns. 2. It can be used as the outer sleeve for laying pipelines underground, such as tap water, electric power and telecommunications, and gas forces. 3. Vertical and horizontal drainage and seepage of expressway. Installation and construction steps of cement pipe company. 1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement.

 Jiujiang Cement Pile

Jiujiang Cement Pile

Compared with other pile types, especially prestressed concrete pipe piles, hollow square piles have the following outstanding advantages: ① large surface area and square or polygonal angle, the angle of repose between the pile and the soil in the soil layer is much larger than the circular surface, which means that hollow square piles can obtain greater bearing capacity than pipe piles under the same geological conditions, saving a lot of foundation funds for the project; ② By comparison, the bearing capacity of 350 hollow square piles is equivalent to that of 500 outer diameter thick wall pipe piles, and the cost per KN bearing capacity is lower than that of prestressed concrete pipe piles, which means that designers can select square piles under the same design bearing capacity, while the market price of 350 hollow square piles is less than that of 500 outer diameter thick wall pipe piles, which can save a lot of material costs;

 Jiujiang Cement Pile

Jiujiang Cement Pile

The general defect is corrosion, which mainly includes pitting and erosion. These two corrosion modes are chronic and not easy to be found by testers. The other is stress corrosion cracking, which is caused by corrosion, tension and stress at the same time. Mechanical damage is also a defect of cement pipes, mainly including gouges and dents with gouges, which are usually caused by mechanical loss. External crack defects are plane defects of cement pipes, which are easy to be found. Peeling is a serious wear condition, and perforation will cause fracture or leakage. Therefore, cement pipes should be tested in time. Once defects are found, corresponding repair measures should be taken immediately to eliminate potential safety hazards and ensure safety.