Article publishing
Home page > Article publishing > Quotation of Harbin cement tank

Quotation of Harbin cement tank

Release time: 2023-12-28 01:37:48
 Quotation of Harbin cement tank

Quotation of Harbin cement tank

Before application, be sure to check whether each part is normal, and ensure the safety factor of each rubber hose connection. With the continuous and sustainable development trend of cement pipes and the increasing number of applications, problems such as pipeline leakage of cement pipes due to design, production and manufacturing or lack of maintenance have arisen. This has seriously affected the product quality of cement pipes and threatened everyone's personal safety. Therefore, we must strictly inspect the cement pipes in the whole process of application, so that we can see what problems are likely to occur in the whole process of application of cement pipes.

 Quotation of Harbin cement tank

Quotation of Harbin cement tank

Before the cement pipe is laid down, the elevation of the pipe top shall be controlled with a level gauge. The pipes shall be arranged from low to high. The pipes shall be placed in place and then corrected manually with excavator. The socket and spigot shall face the upstream direction, and the inner wall of the socket and spigot shall be coated with washing water, so that the rubber ring can slide in smoothly when inserting pipes and facilitate installation. In addition, the cement pipes passing the installation inspection shall be backfilled immediately, and the pipes with larger specifications shall be backfilled to at least one time the pipe diameter above the pipe top to ensure that the cement pipes can avoid directly loading the ground pressure. After backfilling, the ground shall be cleaned. In this way, the laying of a cement pipeline can be completed, and a complete underground pipeline system can be officially put into use, making its due contribution to the environmental protection construction of the city.

 Quotation of Harbin cement tank

Quotation of Harbin cement tank

The application of electric oil pump must refer to the manual of electric oil pump. In case of use, the requirements in the key main parameters should be followed very well. Do not be overweight. After arriving at the travel arrangement, pressure should be applied. Otherwise, when the height width ratio of lifting or the lifting tonnage exceeds the requirements, the top of the hydraulic cylinder may have serious oil leakage. Before application, be sure to check whether each part is normal, and ensure the safety factor of each rubber hose connection. With the continuous and sustainable development trend of cement pipes and the increasing number of applications, problems such as pipeline leakage of cement pipes due to design, production and manufacturing or lack of maintenance have arisen.

 Quotation of Harbin cement tank

Quotation of Harbin cement tank

How is Jiaxing cement pipe made? First of all, the items needed for the production of cement pipes: steel bars, fine aggregate concrete, seam slots, steam chambers, reinforced shelves, cement pipe molds. Manufacturing process of cement pipe: first bind the reinforcement of cement pipe on a shelf, then wrap the reinforcement cage with a special mold, then pour fine aggregate concrete from a slot, seal the slot, then turn on the motor, make the rotary shaft in the cement pipe run to drive the cement pipe to rotate, make the concrete gradually dense through centrifugal operation, and then put it into the steam chamber for curing, Take it out when the strength of formwork removal is reached.

 Quotation of Harbin cement tank

Quotation of Harbin cement tank

5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.

 Quotation of Harbin cement tank

Quotation of Harbin cement tank

1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.