Foshan Cement Pipe Wholesale
More rigorous and standardized measures and construction steps are also proposed for the cement pipeline according to the requirements: first, the surveying and setting out work should be in the charge of a full-time surveyor, and the construction of surveying and setting out records and check filing system should be strictly implemented, using calibrated instruments. According to the design drawings and pile handover records, check the bench marks, establish temporary bench marks, do a good job of protection, and conduct closed resurvey to control the elevation. Secondly, after the trench is excavated in sections, the elevation and elevation shall be reviewed in time to control the elevation of excavation, cushion and foundation surface. Then the block stones are pressed and compacted, the soil is removed, the reinforcement is laid, and the plank is erected Re pouring place.
Foshan Cement Pipe Wholesale
Before the cement pipe is laid in the ground, professionals should check whether the cement pipe is in good condition and whether there are cracks. Small cracks can be repaired on the spot. If large cracks affect the construction safety, return to the factory and replace the qualified cement pipe. The foundation for pipeline laying must be strictly controlled. The cement pipe manufacturer shall be responsible for the construction and the quality department shall supervise the construction. The problems must be checked layer by layer. The problems shall not be buried underground, otherwise, the quality will directly affect the later construction, and further maintenance will consume more human and material resources. When laying the pipeline, the manufacturer's construction team shall strictly follow the construction scheme, and shall not change the construction scheme or cut corners without authorization, otherwise the hidden dangers of engineering quality left after laying will be seriously affected.

Foshan Cement Pipe Wholesale
1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.
Foshan Cement Pipe Wholesale
Salt: When the concrete contacts with water with many soluble salt compounds, these salt compounds will seep into the concrete, and the salt will be continuously concentrated in the concrete and become crystalline, and the volume will often become larger during crystallization. Therefore, it will lead to cracking and damage of concrete materials, which will be corroded by sulfate. When cement pipe plants use concrete, the common form of chemical corrosion is sulfate corrosion, and sulfate reacts with vanadite in cement to produce sulphoaluminate. At the same time, it will increase, which will crack the concrete material.