Zhangjiakou cement pipe manufacturer
1、 Factors affecting the price fluctuation of reinforced concrete cement pipes. 1. The quality of materials used for cement pipes will affect the price of cement pipes: generally speaking, the price of cement pipes will be slightly higher than the market average price if the quality of raw materials used for cement pipes is high, while the price of cement pipes with ordinary quality will be slightly lower. 2. The manufacturing process of cement pipes will also affect the price of cement pipes: generally, different types of cement pipes adopt different manufacturing processes, some are complex and tedious, some are simple and take less time, so the prices of different cement pipes will be different.
Zhangjiakou cement pipe manufacturer
In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column. The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application.
Zhangjiakou cement pipe manufacturer
Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

Zhangjiakou cement pipe manufacturer
3. For the connection, as long as the flexible rubber ring is used, the street seal can work well. Long term operation. High quality, no leakage 4. The inner wall of the pipeline is flat and yellow, and the fluid friction is relatively small. If used on the ground, the service life will exceed 20 years. Cement pipes have been widely used in industrial production and urban planning and construction, and have played a key role, such as coating pipes used for drinking water, electric power engineering communication equipment, natural gas camp, etc., which must be laid underground. The quality assurance of infrastructure is the foundation of engineering construction in all big cities, so more stringent regulations must be made on the construction materials.
Zhangjiakou cement pipe manufacturer
Before the cement pipe is laid down, the elevation of the pipe top shall be controlled with a level gauge. The pipes shall be arranged from low to high. The pipes shall be placed in place and then corrected manually with excavator. The socket and spigot shall face the upstream direction, and the inner wall of the socket and spigot shall be coated with washing water, so that the rubber ring can slide in smoothly when inserting pipes and facilitate installation. In addition, the cement pipes passing the installation inspection shall be backfilled immediately, and the pipes with larger specifications shall be backfilled to at least one time the pipe diameter above the pipe top to ensure that the cement pipes can avoid directly loading the ground pressure. After backfilling, the ground shall be cleaned. In this way, the laying of a cement pipeline can be completed, and a complete underground pipeline system can be officially put into use, making its due contribution to the environmental protection construction of the city.

Zhangjiakou cement pipe manufacturer
5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.