Article publishing
Home page > Article publishing > Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

Release time: January 3, 2025 01:05:39
 Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

4. Excavator shall excavate to an elevation of about 10cm at the bottom of the trench. The soil at the bottom of the reserved trench shall not be excavated, and then it shall be removed manually to trim the trench bottom. Manually clean the trench, carefully check whether the soil at the bottom of the trench is disturbed, and if there is any, handle it. 5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil stacking on one side of the trench edge shall not be more than 2m, and the distance from the trench edge shall not be less than 1m. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, which is conducive to construction, and to ensure the safety of various embedded pipelines. During construction, support and protection measures shall be taken for exposed pipelines. 7. After the installation and connection construction, it is necessary to conduct a water discharge test, carefully observe for a period of time to check whether there is water seepage and leakage, and timely repair the problems found.

 Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

Cement pipe drainage pipe body has many characteristics. Its heat resistance, flame retardancy and resilience are outstanding features. It is not metal but pipe. No magnetism. Therefore, when placed in the cement tank, no vortex will occur. Cement pipes can be used in many fields, such as rainwater drainage, sewage drainage, industrial wastewater drainage and community drainage. As well as the buried pipelines of highways, or for protecting cables, optical cables, etc. Then the cement pipeline has the following characteristics: 1. Generally speaking, it has rigidity, flexibility and excellent mechanical properties. And it has strong compressive properties. 2. The chemical property is stable, generally corrosion resistant, but non-toxic, and it is an excellent environmental protection pipe.

 Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

The newly developed hollow square pile has completely overcome this disadvantage by combining centrifugal and prestressed technology with internal hollow. In the market, prestressed concrete pipe piles are used more frequently in industrial and civil buildings. They overcome the shortcomings of the previous pile types and have their own characteristics, but the disadvantages are also obvious: the appearance is smooth and round, especially when used as friction piles, the friction force with soil is small, and many projects have to use pipe piles with large outer diameter or simply use solid square piles, Increased project cost; The bending resistance of thin-walled pipe piles is poor, especially the shear resistance and tensile resistance of the pile body, which has buried hidden dangers in the foundation of the building

 Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

With the improvement of people's requirements for living environment, various construction measures have also raised the requirements accordingly. In the construction of drainage and sewage pipelines for urban construction, the requirements for the installation of cement pipelines have also been raised accordingly. This not only makes strict requirements on the quality and material of cement pipes, but also regulates the construction. Corresponding construction management specifications have also been formulated for the installation of cement pipelines. First of all, during installation, it is necessary to measure and set out first, and then dig trenches and earth according to the specifications of cement pipes. When laying the pipeline, the pipeline foundation construction shall be carried out first, and then the cement pipeline shall be cleaned inside the pipe, and then the concrete pouring inspection well and the anchor pouring shall be carried out. After these works are completed, the trench shall be backfilled as required.

 Zhenjiang Cement Pipe Wholesale

Zhenjiang Cement Pipe Wholesale

4) When mixing and sinking, start the rotary table of the deep mixing pile machine. When the speed of the mixing head is normal, the drill pipe can be mixed while sinking along the guide frame. The sinking speed can be adjusted by the gear, and the working current should not be greater than the rated value. 5) After the grout is mixed and lifted and sunk to the design depth, start the mortar pump, send the grout through the pipeline to the grout outlet of the mixing head, start the mixing pile machine and tighten the chain device after the grout is discharged, and lift the drill pipe while spraying and mixing according to the designed lifting speed (0.50~0.8m/min) to fully mix the grout and soil. 6) Repeat mixing and sinking. After the mixing bit is lifted to 500mm above the pile top, turn off the mortar pump, repeat mixing and sinking to the design depth, and the sinking speed shall be in accordance with the design requirements.