Price of Huai'an cement pile
7) The grout is repeatedly stirred and lifted. After sinking to the design depth, the grout is repeatedly stirred and lifted until it reaches the ground. 8) The pile driver is moved. After the construction of one pile, move the pile driver to the next pile position, and repeat the above steps for the construction of the next pile. Jiaxing cement pipeline, also known as cement pressure pipe and reinforced concrete pipe, can be used as sewer pipe in urban construction, sewage drainage, flood control and drainage, as well as water supply pipes and farm motor wells used in some special factories and mines. Generally, it is divided into: plain end reinforced concrete cement pipe, flexible rebated reinforced concrete cement pipe, socket reinforced concrete cement pipe, F-shaped steel socket cement pipe, plain end ring joint cement pipe, rebated cement pipe, etc.
Price of Huai'an cement pile
2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly carried out by excavator, supplemented by manual bottom cleaning. Rainwater bucket connecting pipes and branch pipes are manually excavated. During excavation, pay attention to the change of soil quality, and support and enclosure the sections with signs of collapse. 4. Excavate by excavator until the elevation of the trench bottom is about 10cm. Do not excavate the reserved trench bottom soil, and then remove it manually to trim the trench bottom. Manually clean the tank, carefully check the soil at the bottom of the tank for disturbance, and if there is any disturbance, special treatment shall be carried out.
Price of Huai'an cement pile
With the improvement of people's requirements for living environment, various construction measures have also raised the requirements accordingly. In the construction of drainage and sewage pipelines for urban construction, the requirements for the installation of cement pipelines have also been raised accordingly. This not only makes strict requirements on the quality and material of cement pipes, but also regulates the construction. Corresponding construction management specifications have also been formulated for the installation of cement pipelines. First of all, during installation, it is necessary to measure and set out first, and then dig trenches and earth according to the specifications of cement pipes. When laying the pipeline, the pipeline foundation construction shall be carried out first, and then the cement pipeline shall be cleaned inside the pipe, and then the concrete pouring inspection well and the anchor pouring shall be carried out. After these works are completed, the trench shall be backfilled as required.

Price of Huai'an cement pile
4. Excavator shall excavate to an elevation of about 10cm at the bottom of the trench. The soil at the bottom of the reserved trench shall not be excavated, and then it shall be removed manually to trim the trench bottom. Manually clean the trench, carefully check whether the soil at the bottom of the trench is disturbed, and if there is any, handle it. 5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil stacking on one side of the trench edge shall not be more than 2m, and the distance from the trench edge shall not be less than 1m. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, which is conducive to construction, and to ensure the safety of various embedded pipelines. During construction, support and protection measures shall be taken for exposed pipelines. 7. After the installation and connection construction, it is necessary to conduct a water discharge test, carefully observe for a period of time to check whether there is water seepage and leakage, and timely repair the problems found.