Article publishing
Home page > Article publishing > Liaoning cement pipe price

Liaoning cement pipe price

Release time: January 7, 2025 01:05:20
 Liaoning cement pipe price

Liaoning cement pipe price

Bored cast-in-place pile has strong vitality because of its high bearing capacity and adaptability to complex geology. However, this pile type needs to deal with the mud pumped out during construction, which causes serious environmental pollution. It has been less used in urban construction at home and abroad, and its production cost is quite high, so it is relatively less used in general industrial and civil buildings. The advantages and disadvantages of precast concrete square piles have been described, which will not be repeated, but it is worth mentioning that its construction damage rate is very low, which is also one of the starting points for our development and production of prestressed hollow square piles; At the same time, because it is solid and has a large dead weight, cracks often appear on the pile body during construction, resulting in poor durability of the pile

 Liaoning cement pipe price

Liaoning cement pipe price

The theoretical calculated shear resistance of square pile is 2-3 times of that of the same pipe pile. According to the actual test of Japan's Ministry of Construction, it is 4.5 times of that of the pipe pile. This shows that the seismic performance of hollow square pile is very superior, and it is worth popularizing in earthquake prone areas, high-rise buildings, and building foundations with large areas of basements; The hollow square pile inherits and develops the low construction damage rate of the original concrete square pile. The high-strength concrete with a square head has better impact resistance than the pipe pile, and a much smaller damage rate of the pile head; The square has a larger welding perimeter than the round, fully ensuring the effective welding strength between each section of the pile, greatly reducing the joint desoldering or displacement of the square pile during construction, and making the pile quality better

 Liaoning cement pipe price

Liaoning cement pipe price

Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

 Liaoning cement pipe price

Liaoning cement pipe price

4. Excavator shall excavate to an elevation of about 10cm at the bottom of the trench. The soil at the bottom of the reserved trench shall not be excavated, and then it shall be removed manually to trim the trench bottom. Manually clean the trench, carefully check whether the soil at the bottom of the trench is disturbed, and if there is any, handle it. 5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil stacking on one side of the trench edge shall not be more than 2m, and the distance from the trench edge shall not be less than 1m. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, which is conducive to construction, and to ensure the safety of various embedded pipelines. During construction, support and protection measures shall be taken for exposed pipelines. 7. After the installation and connection construction, it is necessary to conduct a water discharge test, carefully observe for a period of time to check whether there is water seepage and leakage, and timely repair the problems found.

 Liaoning cement pipe price

Liaoning cement pipe price

More rigorous and standardized measures and construction steps are also proposed for the cement pipeline according to the requirements: first, the surveying and setting out work should be in the charge of a full-time surveyor, and the construction of surveying and setting out records and check filing system should be strictly implemented, using calibrated instruments. According to the design drawings and pile handover records, check the bench marks, establish temporary bench marks, do a good job of protection, and conduct closed resurvey to control the elevation. Secondly, after the trench is excavated in sections, the elevation and elevation shall be reviewed in time to control the elevation of excavation, cushion and foundation surface. Then the block stones are pressed and compacted, the soil is removed, the reinforcement is laid, and the plank is erected Re pouring place.

 Liaoning cement pipe price

Liaoning cement pipe price

Solution to surface crack of cement pipe. First of all, we should reasonably control the temperature raising speed inside the cement pipe. We can add appropriate mineral ash in the production of cement pipe to ease the release rate of water binder ratio; Secondly, by controlling the temperature of raw materials, we can select a condenser inside the cement pipe structure to cool the circulating water and release the specific energy of water glue. When cracks have already appeared, people usually paint cement mortar or low viscosity polymer for sealing to avoid water intrusion; If the crack is deep or wide, the working pressure grouting shall be used for technical repair.