Article publishing
Home page > Article publishing > Quotation of Hebei cement tank

Quotation of Hebei cement tank

Release time: January 15, 2025 01:05:33
 Quotation of Hebei cement tank

Quotation of Hebei cement tank

The newly developed hollow square pile has completely overcome this disadvantage by combining centrifugal and prestressed technology with internal hollow. In the market, prestressed concrete pipe piles are used more frequently in industrial and civil buildings. They overcome the shortcomings of the previous pile types and have their own characteristics, but the disadvantages are also obvious: the appearance is smooth and round, especially when used as friction piles, the friction force with soil is small, and many projects have to use pipe piles with large outer diameter or simply use solid square piles, Increased project cost; The bending resistance of thin-walled pipe piles is poor, especially the shear resistance and tensile resistance of the pile body, which has buried hidden dangers in the foundation of the building

 Quotation of Hebei cement tank

Quotation of Hebei cement tank

Before the cement pipe is laid down, the elevation of the pipe top shall be controlled with a level gauge. The pipes shall be arranged from low to high. The pipes shall be placed in place and then corrected manually with excavator. The socket and spigot shall face the upstream direction, and the inner wall of the socket and spigot shall be coated with washing water, so that the rubber ring can slide in smoothly when inserting pipes and facilitate installation. In addition, the cement pipes passing the installation inspection shall be backfilled immediately, and the pipes with larger specifications shall be backfilled to at least one time the pipe diameter above the pipe top to ensure that the cement pipes can avoid directly loading the ground pressure. After backfilling, the ground shall be cleaned. In this way, the laying of a cement pipeline can be completed, and a complete underground pipeline system can be officially put into use, making its due contribution to the environmental protection construction of the city.

 Quotation of Hebei cement tank

Quotation of Hebei cement tank

Temperature: for the solidified mortar layer or concrete component, if the cement pipe factory is often in high temperature and extreme heat conditions, there will be strength loss. This is because the calcium hydroxide in the cement stone will be separated under high temperature conditions. In addition, some aggregates will separate or expand in volume under high temperature conditions. Cement raw materials: when selecting cement, cement varieties with high strength, good durability, appropriate price and reliable quality should be selected. The cement varieties with special properties shall be selected according to the service conditions of cement pipes; It is an important condition to ensure the durability of cement pipes to select better sand and stone aggregates, and sand and stone aggregates with good quality and qualified technical conditions.

 Quotation of Hebei cement tank

Quotation of Hebei cement tank

5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.

 Quotation of Hebei cement tank

Quotation of Hebei cement tank

Solution to surface crack of cement pipe. First of all, we should reasonably control the temperature raising speed inside the cement pipe. We can add appropriate mineral ash in the production of cement pipe to ease the release rate of water binder ratio; Secondly, by controlling the temperature of raw materials, we can select a condenser inside the cement pipe structure to cool the circulating water and release the specific energy of water glue. When cracks have already appeared, people usually paint cement mortar or low viscosity polymer for sealing to avoid water intrusion; If the crack is deep or wide, the working pressure grouting shall be used for technical repair. In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column.

 Quotation of Hebei cement tank

Quotation of Hebei cement tank

The theoretical calculated shear resistance of square pile is 2-3 times of that of the same pipe pile. According to the actual test of Japan's Ministry of Construction, it is 4.5 times of that of the pipe pile. This shows that the seismic performance of hollow square pile is very superior, and it is worth popularizing in earthquake prone areas, high-rise buildings, and building foundations with large areas of basements; The hollow square pile inherits and develops the low construction damage rate of the original concrete square pile. The high-strength concrete with a square head has better impact resistance than the pipe pile, and a much smaller damage rate of the pile head; The square has a larger welding perimeter than the round, fully ensuring the effective welding strength between each section of the pile, greatly reducing the joint desoldering or displacement of the square pile during construction, and making the pile quality better