Article publishing
Home page > Article publishing > Which is the best cement pile in Henan

Which is the best cement pile in Henan

Release time: January 18, 2025 01:05:13
 Which is the best cement pile in Henan

Which is the best cement pile in Henan

Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

 Which is the best cement pile in Henan

Which is the best cement pile in Henan

In the existing market, cast-in-place pipe sinking piles, precast concrete piles, bored cast-in-place piles and prestressed concrete pipe piles are widely used. Among the above pile types, prestressed concrete pipe piles are widely used due to the advantages of factory prefabrication, high concrete strength, convenient construction, and fast cycle, while cast-in-place pipe sinking piles are difficult to ensure their quality due to the need for on-site production, Due to serious environmental pollution, it is not suitable for geological conditions with thick soft soil layer, which is prone to necking, and the construction period is very long, so it has gradually been eliminated by the market. For example, the Guangdong Provincial Construction Commission has clearly stipulated that the use of immersed cast-in-place piles is not allowed, and the Zhejiang Provincial Department of Construction has also restricted the use of immersed cast-in-place piles.

 Which is the best cement pile in Henan

Which is the best cement pile in Henan

Precautions for installation and connection of cement pipe 1. The newly welded joint can be corrected within the specified cooling time, and a small amount of rotation is allowed. However, after the cooling time, forced correction is strictly prohibited. Note: The connected pipes and pipe fittings shall not be inclined. They shall be basically horizontal and vertical to avoid incorrect angle when installing the faucet. 2. It is forbidden to let the newly processed joint bear external force within the specified cooling time. 3. When PP-R pipe fittings with metal threads are used, the white raw material tape must be firmly sealed to avoid water leakage from the threads. 4. When overtightening PP-R pipe fittings with metal threads, the pipe fittings may be cracked, resulting in water leakage. Pay attention to the appropriate force.

 Which is the best cement pile in Henan

Which is the best cement pile in Henan

1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.