Salt: When the concrete contacts with water with many soluble salt compounds, these salt compounds will seep into the concrete, and the salt will be continuously concentrated in the concrete and become crystalline, and the volume will often become larger during crystallization. Therefore, it will lead to cracking and damage of concrete materials, which will be corroded by sulfate. When cement pipe plants use concrete, the common form of chemical corrosion is sulfate corrosion, and sulfate reacts with vanadite in cement to produce sulphoaluminate. At the same time, it will increase, which will crack the concrete material.
Fuzhou Cement Pipe Plant
More rigorous and standardized measures and construction steps are also proposed for the cement pipeline according to the requirements: first, the surveying and setting out work should be in the charge of a full-time surveyor, and the construction of surveying and setting out records and check filing system should be strictly implemented, using calibrated instruments. According to the design drawings and pile handover records, check the bench marks, establish temporary bench marks, do a good job of protection, and conduct closed resurvey to control the elevation. Secondly, after the trench is excavated in sections, the elevation and elevation shall be reviewed in time to control the elevation of excavation, cushion and foundation surface. Then the block stones are pressed and compacted, the soil is removed, the reinforcement is laid, and the plank is erected Re pouring place.
Fuzhou Cement Pipe Plant
5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.
Fuzhou Cement Pipe Plant
Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

Fuzhou Cement Pipe Plant
2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly carried out by excavator, supplemented by manual bottom cleaning. Rainwater bucket connecting pipes and branch pipes are manually excavated. During excavation, pay attention to the change of soil quality, and support and enclosure the sections with signs of collapse. 4. Excavate by excavator until the elevation of the trench bottom is about 10cm. Do not excavate the reserved trench bottom soil, and then remove it manually to trim the trench bottom. Manually clean the tank, carefully check the soil at the bottom of the tank for disturbance, and if there is any disturbance, special treatment shall be carried out.