In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column. The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application.

 Quanzhou Cement Pipe Wholesale

Quanzhou Cement Pipe Wholesale

5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil piling on one side of the trench shall not be more than 2 meters, and the distance from the trench edge shall not be less than 1 meter. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, facilitate construction, and ensure the safety of various embedded pipelines, Support protection measures shall be taken for exposed pipelines.

 Quanzhou Cement Pipe Wholesale

Quanzhou Cement Pipe Wholesale

Before the cement pipe is laid in the ground, professionals should check whether the cement pipe is in good condition and whether there are cracks. Small cracks can be repaired on the spot. If large cracks affect the construction safety, return to the factory and replace the qualified cement pipe. The foundation for pipeline laying must be strictly controlled. The cement pipe manufacturer shall be responsible for the construction and the quality department shall supervise the construction. The problems must be checked layer by layer. The problems shall not be buried underground, otherwise, the quality will directly affect the later construction, and further maintenance will consume more human and material resources. When laying the pipeline, the manufacturer's construction team shall strictly follow the construction scheme, and shall not change the construction scheme or cut corners without authorization, otherwise the hidden dangers of engineering quality left after laying will be seriously affected.

 Quanzhou Cement Pipe Wholesale

Quanzhou Cement Pipe Wholesale

The common problem of cement pipe is erosion. The erosion problem of cement pipe mainly includes crevice corrosion and corrosion. These two erosion methods belong to diffuse erosion and are not easy to be detected by inspectors. The other kind of intergranular corrosion cracking is the pipeline cracking caused by erosion and other external effects of support force and ground stress, causing huge damage. At this time, the pipeline shall be removed and replaced in time. There is also a common problem of mechanical equipment damage. This kind of damage mainly includes chisels and pits containing chisels, which is generally caused by mechanical equipment damage. External cracks are also a problem of cement pipes. These problems belong to the plan problem and can be easily detected. Peeling is a relatively serious damage condition, and perforation will lead to fracture or leakage.

 Quanzhou Cement Pipe Wholesale

Quanzhou Cement Pipe Wholesale

Principle of pipeline well crossing method: when the cement pipeline meets the crossing of existing pipelines or rainwater and sewage pipes during burial, the pipeline well crossing method is adopted, which can reduce the buried depth of the pipeline and is not easy to block. An inspection well shall be set at the intersection of pipelines to let another pipeline pass through the well. The key is to ensure that the water flowing area in the well (the area of the shadowed part in the figure) is greater than or equal to the sectional area of the pipeline to be passed through. The size of the water flowing area in the well can be controlled by the size of the pipe passing inspection well. The principle of pipe passing is small pipe passing through large pipe, and the current pipeline passing through the planned pipeline.