Baoding Cement Pile Plant
The shape of square pile is easier to develop a non welded quick connector, which can truly achieve all-weather construction, and construction is faster, which can avoid cracking of welded pile head in high groundwater level. 1) Positioning, centering and leveling of the pile driver. After the mixing pile position is placed, move the mixing pile driver to the designated pile position, centering and leveling (leveling with a level). 2) Adjust the verticality of the guide frame, and use a theodolite or plumb bob to control the verticality of the guide frame in both directions. According to the design and specification requirements, the verticality is less than 1.0% of the pile length. 3) The slurry is premixed in advance. While the deep mixer is premixing and sinking, the cement slurry is mixed in the background and put into the aggregate hopper before grouting. The cement grade 425 # ordinary silicate cement is used to mix the slurry, the water cement ratio is controlled in the range of 0.45~0.50, and the cement consumption per meter of deep mixing pile is not less than 50Kg according to the design requirements.

Baoding Cement Pile Plant
With the improvement of people's requirements for living environment, various construction measures have also raised the requirements accordingly. In the construction of drainage and sewage pipelines for urban construction, the requirements for the installation of cement pipelines have also been raised accordingly. This not only makes strict requirements on the quality and material of cement pipes, but also regulates the construction. Corresponding construction management specifications have also been formulated for the installation of cement pipelines. First of all, during installation, it is necessary to measure and set out first, and then dig trenches and earth according to the specifications of cement pipes. When laying the pipeline, the pipeline foundation construction shall be carried out first, and then the cement pipeline shall be cleaned inside the pipe, and then the concrete pouring inspection well and the anchor pouring shall be carried out. After these works are completed, the trench shall be backfilled as required.

Baoding Cement Pile Plant
Before the cement pipe is laid in the ground, professionals should check whether the cement pipe is in good condition and whether there are cracks. Small cracks can be repaired on the spot. If large cracks affect the construction safety, return to the factory and replace the qualified cement pipe. The foundation for pipeline laying must be strictly controlled. The cement pipe manufacturer shall be responsible for the construction and the quality department shall supervise the construction. The problems must be checked layer by layer. The problems shall not be buried underground, otherwise, the quality will directly affect the later construction, and further maintenance will consume more human and material resources. When laying the pipeline, the manufacturer's construction team shall strictly follow the construction scheme, and shall not change the construction scheme or cut corners without authorization, otherwise the hidden dangers of engineering quality left after laying will be seriously affected.

Baoding Cement Pile Plant
In the existing market, cast-in-place pipe sinking piles, precast concrete piles, bored cast-in-place piles and prestressed concrete pipe piles are widely used. Among the above pile types, prestressed concrete pipe piles are widely used due to the advantages of factory prefabrication, high concrete strength, convenient construction, and fast cycle, while cast-in-place pipe sinking piles are difficult to ensure their quality due to the need for on-site production, Due to serious environmental pollution, it is not suitable for geological conditions with thick soft soil layer, which is prone to necking, and the construction period is very long, so it has gradually been eliminated by the market. For example, the Guangdong Provincial Construction Commission has clearly stipulated that the use of immersed cast-in-place piles is not allowed, and the Zhejiang Provincial Department of Construction has also restricted the use of immersed cast-in-place piles.