Before the cement pipe is laid in the ground, professionals should check whether the cement pipe is in good condition and whether there are cracks. Small cracks can be repaired on the spot. If large cracks affect the construction safety, return to the factory and replace the qualified cement pipe. The foundation for pipeline laying must be strictly controlled. The cement pipe manufacturer shall be responsible for the construction and the quality department shall supervise the construction. The problems must be checked layer by layer. The problems shall not be buried underground, otherwise, the quality will directly affect the later construction, and further maintenance will consume more human and material resources. When laying the pipeline, the manufacturer's construction team shall strictly follow the construction scheme, and shall not change the construction scheme or cut corners without authorization, otherwise the hidden dangers of engineering quality left after laying will be seriously affected.

Yangzhou cement tank price
7) The grout is repeatedly stirred and lifted. After sinking to the design depth, the grout is repeatedly stirred and lifted until it reaches the ground. 8) The pile driver is moved. After the construction of one pile, move the pile driver to the next pile position, and repeat the above steps for the construction of the next pile. Jiaxing cement pipeline, also known as cement pressure pipe and reinforced concrete pipe, can be used as sewer pipe in urban construction, sewage drainage, flood control and drainage, as well as water supply pipes and farm motor wells used in some special factories and mines. Generally, it is divided into: plain end reinforced concrete cement pipe, flexible rebated reinforced concrete cement pipe, socket reinforced concrete cement pipe, F-shaped steel socket cement pipe, plain end ring joint cement pipe, rebated cement pipe, etc.
Yangzhou cement tank price
1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.

Yangzhou cement tank price
2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly carried out by excavator, supplemented by manual bottom cleaning. Rainwater bucket connecting pipes and branch pipes are manually excavated. During excavation, pay attention to the change of soil quality, and support and enclosure the sections with signs of collapse. 4. Excavate by excavator until the elevation of the trench bottom is about 10cm. Do not excavate the reserved trench bottom soil, and then remove it manually to trim the trench bottom. Manually clean the tank, carefully check the soil at the bottom of the tank for disturbance, and if there is any disturbance, special treatment shall be carried out.