Which one is good for Tianjin cement tank

Published on: February 7, 2025 01:04:53
 Which one is good for Tianjin cement tank

Which one is good for Tianjin cement tank

Principle of pipeline well crossing method: when the cement pipeline meets the crossing of existing pipelines or rainwater and sewage pipes during burial, the pipeline well crossing method is adopted, which can reduce the buried depth of the pipeline and is not easy to block. An inspection well shall be set at the intersection of pipelines to let another pipeline pass through the well. The key is to ensure that the water flowing area in the well (the area of the shadowed part in the figure) is greater than or equal to the sectional area of the pipeline to be passed through. The size of the water flowing area in the well can be controlled by the size of the pipe passing inspection well. The principle of pipe passing is small pipe passing through large pipe, and the current pipeline passing through the planned pipeline.

 Which one is good for Tianjin cement tank

Which one is good for Tianjin cement tank

Temperature: for the solidified mortar layer or concrete component, if the cement pipe factory is often in high temperature and extreme heat conditions, there will be strength loss. This is because the calcium hydroxide in the cement stone will be separated under high temperature conditions. In addition, some aggregates will separate or expand in volume under high temperature conditions. Cement raw materials: when selecting cement, cement varieties with high strength, good durability, appropriate price and reliable quality should be selected. The cement varieties with special properties shall be selected according to the service conditions of cement pipes; It is an important condition to ensure the durability of cement pipes to select better sand and stone aggregates, and sand and stone aggregates with good quality and qualified technical conditions.

 Which one is good for Tianjin cement tank

Which one is good for Tianjin cement tank

1. Before putting the cement pipe into use, check whether the cement pipe is intact. If there are cracks, repair them in time. If they cannot be repaired, replace them. Do not use damaged or inferior cement pipes, which will affect the safety of the project. 2. The workers of cement pipe laying must have professional experience, the relevant departments should do a good job in supervision, and each procedure should be well controlled, otherwise the unqualified foundation in the early stage will lead to more problems in the later construction, and the problem should not be buried underground, because maintenance will consume a lot of human and financial resources. 3. When laying pipelines, the established construction scheme shall be strictly followed, and do not make decisions or cut corners, otherwise the project quality will not be guaranteed. 4. After the cement pipe is laid, the special quality inspection department shall further review it to ensure the project quality.

 Which one is good for Tianjin cement tank

Which one is good for Tianjin cement tank

1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.

 Which one is good for Tianjin cement tank

Which one is good for Tianjin cement tank

4) When mixing and sinking, start the rotary table of the deep mixing pile machine. When the speed of the mixing head is normal, the drill pipe can be mixed while sinking along the guide frame. The sinking speed can be adjusted by the gear, and the working current should not be greater than the rated value. 5) After the grout is mixed and lifted and sunk to the design depth, start the mortar pump, send the grout through the pipeline to the grout outlet of the mixing head, start the mixing pile machine and tighten the chain device after the grout is discharged, and lift the drill pipe while spraying and mixing according to the designed lifting speed (0.50~0.8m/min) to fully mix the grout and soil. 6) Repeat mixing and sinking. After the mixing bit is lifted to 500mm above the pile top, turn off the mortar pump, repeat mixing and sinking to the design depth, and the sinking speed shall be in accordance with the design requirements.