Guizhou cement pipe manufacturer
1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.

Guizhou cement pipe manufacturer
Solution to surface crack of cement pipe. First of all, we should reasonably control the temperature raising speed inside the cement pipe. We can add appropriate mineral ash in the production of cement pipe to ease the release rate of water binder ratio; Secondly, by controlling the temperature of raw materials, we can select a condenser inside the cement pipe structure to cool the circulating water and release the specific energy of water glue. When cracks have already appeared, people usually paint cement mortar or low viscosity polymer for sealing to avoid water intrusion; If the crack is deep or wide, the working pressure grouting shall be used for technical repair. In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column.
Guizhou cement pipe manufacturer
The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application. The application of electric oil pump must refer to the manual of electric oil pump. In case of use, the requirements in the key main parameters should be followed very well. Do not be overweight. After arriving at the travel arrangement, pressure should be applied. Otherwise, when the height width ratio of lifting or the lifting tonnage exceeds the requirements, the top of the hydraulic cylinder may have serious oil leakage.
Guizhou cement pipe manufacturer
1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.
Guizhou cement pipe manufacturer
Cement pipe drainage pipe body has many characteristics. Its heat resistance, flame retardancy and resilience are outstanding features. It is not metal but pipe. No magnetism. Therefore, when placed in the cement tank, no vortex will occur. Cement pipes can be used in many fields, such as rainwater drainage, sewage drainage, industrial wastewater drainage and community drainage. As well as the buried pipelines of highways, or for protecting cables, optical cables, etc. Then the cement pipeline has the following characteristics: 1. Generally speaking, it has rigidity, flexibility and excellent mechanical properties. And it has strong compressive properties. 2. The chemical property is stable, generally corrosion resistant, but non-toxic, and it is an excellent environmental protection pipe.
Guizhou cement pipe manufacturer
In the existing market, cast-in-place pipe sinking piles, precast concrete piles, bored cast-in-place piles and prestressed concrete pipe piles are widely used. Among the above pile types, prestressed concrete pipe piles are widely used due to the advantages of factory prefabrication, high concrete strength, convenient construction, and fast cycle, while cast-in-place pipe sinking piles are difficult to ensure their quality due to the need for on-site production, Due to serious environmental pollution, it is not suitable for geological conditions with thick soft soil layer, which is prone to necking, and the construction period is very long, so it has gradually been eliminated by the market. For example, the Guangdong Provincial Construction Commission has clearly stipulated that the use of immersed cast-in-place piles is not allowed, and the Zhejiang Provincial Department of Construction has also restricted the use of immersed cast-in-place piles.