Which one is good for Zhangjiakou cement trough
Before application, be sure to check whether each part is normal, and ensure the safety factor of each rubber hose connection. With the continuous and sustainable development trend of cement pipes and the increasing number of applications, problems such as pipeline leakage of cement pipes due to design, production and manufacturing or lack of maintenance have arisen. This has seriously affected the product quality of cement pipes and threatened everyone's personal safety. Therefore, we must strictly inspect the cement pipes in the whole process of application, so that we can see what problems are likely to occur in the whole process of application of cement pipes.
Which one is good for Zhangjiakou cement trough
Before the cement pipe is laid down, the elevation of the pipe top shall be controlled with a level gauge. The pipes shall be arranged from low to high. The pipes shall be placed in place and then corrected manually with excavator. The socket and spigot shall face the upstream direction, and the inner wall of the socket and spigot shall be coated with washing water, so that the rubber ring can slide in smoothly when inserting pipes and facilitate installation. In addition, the cement pipes passing the installation inspection shall be backfilled immediately, and the pipes with larger specifications shall be backfilled to at least one time the pipe diameter above the pipe top to ensure that the cement pipes can avoid directly loading the ground pressure. After backfilling, the ground shall be cleaned. In this way, the laying of a cement pipeline can be completed, and a complete underground pipeline system can be officially put into use, making its due contribution to the environmental protection construction of the city.

Which one is good for Zhangjiakou cement trough
1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.
Which one is good for Zhangjiakou cement trough
After the pipeline is laid, the project acceptor will send professionals to carry out re acceptance and testing. If problems occur, they will be repaired in time to eliminate the quality problems of later works. After the construction of Jiaxing cement pipe, the unreasonable design, manufacture, use and maintenance of the cement pipe may cause the natural gas leakage of the pipe, which will lead to an explosion event that will pose a huge threat to people's lives. Therefore, the defect detection of the cement pipe must be carried out at all times. The cement pipe manufacturer will introduce the defects that are easy to occur in the cement pipe, So as to suit the remedy to the case and eliminate potential safety hazards.