The newly developed hollow square pile has completely overcome this disadvantage by combining centrifugal and prestressed technology with internal hollow. In the market, prestressed concrete pipe piles are used more frequently in industrial and civil buildings. They overcome the shortcomings of the previous pile types and have their own characteristics, but the disadvantages are also obvious: the appearance is smooth and round, especially when used as friction piles, the friction force with soil is small, and many projects have to use pipe piles with large outer diameter or simply use solid square piles, Increased project cost; The bending resistance of thin-walled pipe piles is poor, especially the shear resistance and tensile resistance of the pile body, which has buried hidden dangers in the foundation of the building

 Lianyungang Cement Pile Plant

Lianyungang Cement Pile Plant

Cement pipes can be used in many fields, such as rainwater drainage, sewage drainage, industrial wastewater drainage and community drainage. As well as the buried pipelines of highways, or for protecting cables, optical cables, etc. Cement pipes have the following characteristics: 1. Generally speaking, they have rigidity, flexibility and excellent mechanical properties. And it has strong compressive properties. 2. The chemical property is stable, generally corrosion resistant, but non-toxic, and it is an excellent environmental protection pipe. 3. For the connection, as long as the flexible rubber ring is used, the street seal can work well. Long term operation. High quality, no leakage 4. The inner wall of the pipeline is flat and yellow, and the fluid friction is relatively small. If used on the ground, the service life will exceed 20 years.

 Lianyungang Cement Pile Plant

Lianyungang Cement Pile Plant

1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.   

 Lianyungang Cement Pile Plant

Lianyungang Cement Pile Plant

The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew. If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application. The application of electric oil pump must refer to the manual of electric oil pump. In case of use, the requirements in the key main parameters should be followed very well. Do not be overweight. After arriving at the travel arrangement, pressure should be applied. Otherwise, when the height width ratio of lifting or the lifting tonnage exceeds the requirements, the top of the hydraulic cylinder may have serious oil leakage.

 Lianyungang Cement Pile Plant

Lianyungang Cement Pile Plant

The cracks on the surface of cement pipe are mostly caused by folding, and the key can be divided into two categories: one is caused by the evaporation and hardening of the water on the surface of cement pipe during rigid concrete pouring. Generally, the average external temperature of cement pipe during rigid concrete pouring is high, while the air humidity in the air is low, so the surface will volatilize and dry, but the interior is still plastic, This causes cracks. The other is caused by the temperature difference between the inside and outside of the concrete caused by the water cement ratio when the cement pipe is hardened. For deeper cement pipes, the foundation will continue to settle due to its own weight during the whole process of concrete pouring of the top cement pipe. When the cement pipe is exposed to building reinforcement or the connecting anchor bolt of the template and other items just before the final setting but not before the final setting, this kind of foundation settlement will be blocked and will immediately cause cracks.