Chongqing Cement Tank Plant
1. The principle of overflow well discharge method: the sewage is mainly discharged into the municipal sewage pipe through the overflow well, and the pump is used as a supplement to remove the accumulated water in the overflow well and the upstream sewage pipe. The flow should be confirmed by discharging all accumulated water within 30min. In order to reduce the operation cost, the sewage pump can be started before the peak water consumption every day to drain the accumulated water in the overflow well and the upstream pipeline. This can not only prevent sewage from staying in the pipeline for a long time and forming siltation, but also make the ponding pipe section often washed, which is conducive to pipeline ventilation and the removal of harmful gases in the pipeline.
Chongqing Cement Tank Plant
The cause of cracks on the surface of cement pipe. The cracks on the surface of cement pipe are mostly caused by folding, and the key can be divided into two categories: one is caused by the evaporation and hardening of the water on the surface of cement pipe during rigid concrete pouring. Generally, the average external temperature of cement pipe during rigid concrete pouring is high, while the air humidity in the air is low, so the surface will volatilize and dry, but the interior is still plastic, This causes cracks. The other is caused by the temperature difference between the inside and outside of the concrete caused by the water cement ratio when the cement pipe is hardened. For deeper cement pipes, the foundation will continue to settle due to its own weight during the whole process of concrete pouring of the top cement pipe. Then, when the cement pipe is exposed to building reinforcement or the connecting anchor bolt of the template and other items just before the final setting but not before the final setting, this kind of foundation settlement will be blocked and will immediately cause cracks.

Chongqing Cement Tank Plant
When planning the cement pipeline system, the slope of the cement pipeline above the overflow water level should be minimized to reduce the length of the ponding pipe section and the amount of ponding in the drainage system. The slope of the cement pipeline below the overflow water level should not be too small, and it should be ensured that the water flow has a certain scouring strength on the pipeline when the pipeline is evacuated. This method is applicable to the control point of the cement pipeline which is close to the access point of the municipal cement pipe network. If one method is adopted, the cement pipeline in the community cannot be connected to the municipal pipe network, and the residential community or factory area with small scale is also applicable to the rainwater drainage system. When used in the rainwater drainage system, rainwater is discharged through overflow wells. The rainwater pump is only opened after each rain and when the pipeline needs to be dredged and maintained, so as to remove the accumulated water in the pipeline.

Chongqing Cement Tank Plant
4) When mixing and sinking, start the rotary table of the deep mixing pile machine. When the speed of the mixing head is normal, the drill pipe can be mixed while sinking along the guide frame. The sinking speed can be adjusted by the gear, and the working current should not be greater than the rated value. 5) When the grout is mixed and lifted and sunk to the design depth, start the mortar pump, send the grout through the pipeline to the grout outlet of the mixing head, start the mixing pile machine and tighten the chain device after the grout is discharged, and lift the drill pipe while spraying and mixing according to the designed lifting speed (0.50~0.8m/min) to fully mix the grout and soil. 6) Repeat mixing and sinking. After the mixing bit is lifted to 500mm above the pile top, turn off the mortar pump, repeat mixing and sinking to the design depth, and the sinking speed shall be in accordance with the design requirements.