Yancheng Cement Pile Plant
The shape of square pile is easier to develop a non welded quick connector, which can truly achieve all-weather construction, and construction is faster, which can avoid cracking of welded pile head in high groundwater level. 1) Positioning, centering and leveling of the pile driver. After the mixing pile position is placed, move the mixing pile driver to the designated pile position, centering and leveling (leveling with a level). 2) Adjust the verticality of the guide frame, and use a theodolite or plumb bob to control the verticality of the guide frame in both directions. According to the design and specification requirements, the verticality is less than 1.0% of the pile length. 3) The slurry is premixed in advance. While the deep mixer is premixing and sinking, the cement slurry is mixed in the background and put into the aggregate hopper before grouting. The cement grade 425 # ordinary silicate cement is used to mix the slurry, the water cement ratio is controlled in the range of 0.45~0.50, and the cement consumption per meter of deep mixing pile is not less than 50Kg according to the design requirements.

Yancheng Cement Pile Plant
Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

Yancheng Cement Pile Plant
The theoretical calculated shear resistance of square pile is 2-3 times of that of the same pipe pile. According to the actual test of Japan's Ministry of Construction, it is 4.5 times of that of the pipe pile. This shows that the seismic performance of hollow square pile is very superior, and it is worth popularizing in earthquake prone areas, high-rise buildings, and building foundations with large areas of basements; The hollow square pile inherits and develops the low construction damage rate of the original concrete square pile. The high-strength concrete with a square head has better impact resistance than the pipe pile, and a much smaller damage rate of the pile head; The square has a larger welding perimeter than the round, fully ensuring the effective welding strength between each section of the pile, greatly reducing the joint desoldering or displacement of the square pile during construction, and making the pile quality better
Yancheng Cement Pile Plant
The cause of cracks on the surface of cement pipe. The cracks on the surface of cement pipe are mostly caused by folding, and the key can be divided into two categories: one is caused by the evaporation and hardening of the water on the surface of cement pipe during rigid concrete pouring. Generally, the average external temperature of cement pipe during rigid concrete pouring is high, while the air humidity in the air is low, so the surface will volatilize and dry, but the interior is still plastic, This causes cracks. The other is caused by the temperature difference between the inside and outside of the concrete caused by the water cement ratio when the cement pipe is hardened. For deeper cement pipes, the foundation will continue to settle due to its own weight during the whole process of concrete pouring of the top cement pipe. Then, when the cement pipe is exposed to building reinforcement or the connecting anchor bolt of the template and other items just before the final setting but not before the final setting, this kind of foundation settlement will be blocked and will immediately cause cracks.

Yancheng Cement Pile Plant
Properly control the water cement and cement consumption. The water cement ratio is the main factor determining the compactness of concrete, which not only affects the strength of concrete, but also seriously affects its durability. Therefore, strictly control the water cement ratio. Ensuring sufficient cement consumption can also improve the compactness and durability of concrete. The quality of cement pipe depends on these factors, and its quality is very important. The cement pipe with poor quality will expose defects in the process of use, which will affect the normal work.
Yancheng Cement Pile Plant
1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement. 2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly conducted by excavator, supplemented by manual bottom cleaning, and the connection pipe and branch pipe of rainwater hopper are excavated manually. During excavation, pay attention to the change of soil quality, and support the sections with signs of collapse.