How much is the Inner Mongolia cement tank
When planning the cement pipeline system, the slope of the cement pipeline above the overflow water level should be minimized to reduce the length of the ponding pipe section and the amount of ponding in the drainage system. The slope of the cement pipeline below the overflow water level should not be too small, and it should be ensured that the water flow has a certain scouring strength on the pipeline when the pipeline is evacuated. This method is applicable to the control point of the cement pipeline which is close to the access point of the municipal cement pipe network. If one method is adopted, the cement pipeline in the community cannot be connected to the municipal pipe network, and the residential community or factory area with small scale is also applicable to the rainwater drainage system. When used in the rainwater drainage system, rainwater is discharged through overflow wells. The rainwater pump is only opened after each rain and when the pipeline needs to be dredged and maintained, so as to remove the accumulated water in the pipeline.

How much is the Inner Mongolia cement tank
Cement pipe drainage pipe body has many characteristics. Its heat resistance, flame retardancy and resilience are outstanding features. It is not metal but pipe. No magnetism. Therefore, when placed in the cement tank, no vortex will occur. Cement pipes can be used in many fields, such as rainwater drainage, sewage drainage, industrial wastewater drainage and community drainage. As well as the buried pipelines of highways, or for protecting cables, optical cables, etc. Then the cement pipeline has the following characteristics: 1. Generally speaking, it has rigidity, flexibility and excellent mechanical properties. And it has strong compressive properties. 2. The chemical property is stable, generally corrosion resistant, but non-toxic, and it is an excellent environmental protection pipe.
How much is the Inner Mongolia cement tank
2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly carried out by excavator, supplemented by manual bottom cleaning. Rainwater bucket connecting pipes and branch pipes are manually excavated. During excavation, pay attention to the change of soil quality, and support and enclosure the sections with signs of collapse. 4. Excavate by excavator until the elevation of the trench bottom is about 10cm. Do not excavate the reserved trench bottom soil, and then remove it manually to trim the trench bottom. Manually clean the tank, carefully check the soil at the bottom of the tank for disturbance, and if there is any disturbance, special treatment shall be carried out.
How much is the Inner Mongolia cement tank
Maintenance means no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is made, it also needs to carry out 4-6 days of regular maintenance, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

How much is the Inner Mongolia cement tank
Before the cement pipe is laid in the ground, professionals should check whether the cement pipe is in good condition and whether there are cracks. Small cracks can be repaired on the spot. If large cracks affect the construction safety, return to the factory and replace the qualified cement pipe. The foundation for pipeline laying must be strictly controlled. The cement pipe manufacturer shall be responsible for the construction and the quality department shall supervise the construction. The problems must be checked layer by layer. The problems shall not be buried underground, otherwise, the quality will directly affect the later construction, and further maintenance will consume more human and material resources. When laying the pipeline, the manufacturer's construction team shall strictly follow the construction scheme, and shall not change the construction scheme or cut corners without authorization, otherwise the hidden dangers of engineering quality left after laying will be seriously affected.

How much is the Inner Mongolia cement tank
4. Excavator shall excavate to an elevation of about 10cm at the bottom of the trench. The soil at the bottom of the reserved trench shall not be excavated, and then it shall be removed manually to trim the trench bottom. Manually clean the trench, carefully check whether the soil at the bottom of the trench is disturbed, and if there is any, handle it. 5. On both sides of the trench and 1m above the bottom of the trench, elevation piles shall be set symmetrically, and elevation nails of equal height shall be nailed on them. The center line of the pipe channel and the elevation of the elevation pile shall be re measured before the bottom of the trench is reached and the pouring is leveled. 6. The height of soil stacking on one side of the trench edge shall not be more than 2m, and the distance from the trench edge shall not be less than 1m. The protection of underground pipelines for trench construction shall be disclosed to the relevant departments first to clarify the basic location of underground facilities. If necessary, sample holes shall be excavated first to find out the exact location, which is conducive to construction, and to ensure the safety of various embedded pipelines. During construction, support and protection measures shall be taken for exposed pipelines. 7. After the installation and connection construction is completed, water test must be carried out, carefully observe for a period of time to check whether there is water seepage and leakage, and timely repair the problems found.