Price of Zhongshan cement tank
2. Establish temporary bench marks: temporary bench marks are often required for pipeline works, which should be set at a stable place that is not easy to be collided, and the spacing should not be more than 30 meters. The closure error of temporary benchmark shall meet the specified standards. 3. Trench excavation is mainly carried out by excavator, supplemented by manual bottom cleaning. Rainwater bucket connecting pipes and branch pipes are manually excavated. During excavation, pay attention to the change of soil quality, and support and enclosure the sections with signs of collapse. 4. Excavate by excavator until the elevation of the trench bottom is about 10cm. Do not excavate the reserved trench bottom soil, and then remove it manually to trim the trench bottom. Manually clean the tank, carefully check the soil at the bottom of the tank for disturbance, and if there is any disturbance, special treatment shall be carried out.
Price of Zhongshan cement tank
Compared with other pile types, especially prestressed concrete pipe piles, hollow square piles have the following outstanding advantages: ① large surface area and square or polygonal angle, the angle of repose between the pile and the soil in the soil layer is much larger than the circular surface, which means that hollow square piles can obtain greater bearing capacity than pipe piles under the same geological conditions, saving a lot of foundation funds for the project; ② By comparison, the bearing capacity of 350 hollow square piles is equivalent to that of 500 outer diameter thick wall pipe piles, and the cost per KN bearing capacity is lower than that of prestressed concrete pipe piles, which means that designers can select square piles under the same design bearing capacity, while the market price of 350 hollow square piles is less than that of 500 outer diameter thick wall pipe piles, which can save a lot of material costs;
Price of Zhongshan cement tank
Main purpose of cement pipe. 1. It is generally used for drainage pipes of rainwater and sewage in cities and towns. 2. It can be used as the outer sleeve for laying pipelines underground, such as tap water, electric power and telecommunications, and gas forces. 3. Vertical and horizontal drainage and seepage of expressway. Installation and construction steps of cement pipe company. 1. Centerline setting of pipeline: before construction, the starting point, end point, plane break point, longitudinal break point and straight line control center pile of the centerline can be measured on the site according to the center line control point given in the design, and the direction control pile can be set at the appropriate position outside the groove of the starting point and end plane break point, and the pile number can be determined through measurement.
Price of Zhongshan cement tank
3. For the connection, as long as the flexible rubber ring is used, the street seal can work well. Long term operation. High quality, no leakage 4. The inner wall of the pipeline is flat and yellow, and the fluid friction is relatively small. If used on the ground, the service life will exceed 20 years. Cement pipes have been widely used in industrial production and urban planning and construction, and have played a key role, such as coating pipes used for drinking water, electric power engineering communication equipment, natural gas camp, etc., which must be laid underground. The quality assurance of infrastructure is the foundation of engineering construction in all big cities, so more stringent regulations must be made on the construction materials.
Price of Zhongshan cement tank
Principle of pipeline well crossing method: when the cement pipeline meets the crossing of existing pipelines or rainwater and sewage pipes during burial, the pipeline well crossing method is adopted, which can reduce the buried depth of the pipeline and is not easy to block. An inspection well shall be set at the intersection of pipelines to let another pipeline pass through the well. The key is to ensure that the water flowing area in the well (the area of the shadowed part in the figure) is greater than or equal to the sectional area of the pipeline to be passed through. The size of the water flowing area in the well can be controlled by the size of the pipe passing inspection well. The principle of pipe passing is small pipe passing through large pipe, and the current pipeline passing through the planned pipeline.