Jiaxing square pile has prominent advantages in use and has been successfully used in various construction projects. Although precast square piles are excellent building structures, there is no way to ensure the quality of the project if they are not correctly constructed. The following points are the key points of precast square pile construction, which must be done as required.
1、 The square pile construction site shall be prepared. The construction site shall be well drained. There must be no water in the site, and the compactness shall meet the demand. If the pile driver and other construction vehicles cannot walk, there will be potential safety hazards.
2、 Prepare the square pile driver. Before entering the site, check the condition of the pile driver to ensure that the pile driver can work normally.
3、 The surveying equipment shall be prepared for construction, including total station, theodolite, level gauge, etc. The accuracy of these instruments must meet the requirements to avoid accidents due to surveying errors.
4、 For the preparation of electric welding machines and welding materials, qualified welding machines and welding materials must be used to ensure that the welding quality meets the requirements.
The construction sequence of the square pile manufacturer must follow the sequence of the pile number.
1. Measuring and setting out the pile position: when the construction pile position of this project is carried out, it must be measured by a professional survey team entrusted by Party A. In order to ensure the accuracy and simplicity of placement, it was decided to use the coordinate method for actual measurement after research.
2. Unified numbering: during construction, all equipment shall be numbered uniformly according to the pile location plan provided by Party A.
3. Setting out and determination of the pile position: before setting out the pile, the control points must be effectively tested, and after correction, the brickwork can be carried out, and the concrete pouring can be a compulsory protection. Later, before the construction of precast square pile position, the GPS total station shall be used again to retest the pile positions one by one to ensure the correct position of the pile positions.
Pinghu Huafeng Cement Products Factory is a large enterprise engaged in cement products for a long time Cement brick The manufacturer specializes in producing cement pipes, U-grooves, square piles, cement piles, road bricks Cement grass planting brick 、 Cement tile Concrete square piles, solid square piles, cement sewer pipes, concrete cement pipes, curbstones, curbstones, and other cement products, welcome new and old customers to consult and negotiate! //www.jxhfslzp.com Service hotline: 130-9562-2833 (Manager Yu)