Cement tile
 News

News

Current location: home page > News > common problem

Use of cement pipe equipment in urban construction - cement brick manufacturers

2022-04-20 10:26:50
second

In the application of cement pipe, after the electric jack is used to jack in the lifting object, the supporting point of the lifting object shall be fixed with the support column immediately to avoid using the electric jack as the support column.

The center of gravity of the lifting object shall be properly selected, and the power generating point of the electric jack shall be effectively selected. The bottom edge must be paved, and the standard of hard and soft pavement shall be fully considered. Whether to pad the tough wood, whether to place it stably, and avoid weight depression or skew.

If the residual oil of the pump body is not enough, the pump must be filled with oil during operation before application.

The application of electric oil pump must refer to the manual of electric oil pump.

In case of use, the requirements in the key main parameters should be followed very well. Do not be overweight. After arriving at the travel arrangement, pressure should be applied. Otherwise, when the height width ratio of lifting or the lifting tonnage exceeds the requirements, the top of the hydraulic cylinder may have serious oil leakage.

Before application, be sure to check whether each part is normal, and ensure the safety factor of each rubber hose connection.

With the continuous and sustainable development trend of cement pipes and the increasing number of applications, problems such as pipeline leakage of cement pipes due to design, production and manufacturing or lack of maintenance have arisen. This has seriously affected the product quality of cement pipes and threatened everyone's personal safety. Therefore, we must strictly inspect the cement pipes in the whole process of application, so that we can see what problems are likely to occur in the whole process of application of cement pipes.

Problems easy to occur in the whole application process of cement pipe


The common problem of cement pipe is erosion. The erosion problem of cement pipe mainly includes crevice corrosion and corrosion. These two erosion methods belong to diffuse erosion and are not easy to be detected by inspectors. The other kind of intergranular corrosion cracking is the pipeline cracking caused by erosion and other external effects of support force and ground stress, causing huge damage. At this time, the pipeline shall be removed and replaced in time.

There is also a common problem of mechanical equipment damage. This kind of damage mainly includes chisels and pits containing chisels, which is generally caused by mechanical equipment damage.

External cracks are also a problem of cement pipes. These problems belong to the plan problem and can be easily detected. Peeling is a relatively serious damage condition, and perforation will lead to fracture or leakage.

Of course, the maintenance is no steam curing tank. After the cement pipe is made on the cement pipe making machine, it is not necessary to open the grinding tool. Put the cement pipe mold and cement pipe outdoors for regular maintenance. Generally, after the cement pipe is made, it takes one day to carry out outdoor maintenance. The grinding tool can be opened the next day. After the mold is taken out, it also needs to carry out regular maintenance for 4-6 days, and full-time personnel should spray water on the cement pipe three times a day, The time of sprinkling is usually once in the morning, once in the afternoon and once at noon. The purpose of sprinkling is to maintain the environmental humidity of the cement pipe so that the concrete can gradually coagulate itself. The frequency of sprinkling can also be increased and reduced according to the environmental humidity of seasonal changes in weather conditions. But of course, there are more cement pipe molds required for maintenance.

Pinghu Huafeng Cement Products Factory is a large enterprise engaged in cement products for a long time Cement brick The manufacturer specializes in producing cement pipes, U-grooves, square piles, cement piles, road bricks Cement grass planting brick Cement tile Concrete square piles, solid square piles, cement sewer pipes, concrete cement pipes, curbstones, curbstones, and other cement products, welcome new and old customers to consult and negotiate! //www.jxhfslzp.com Service hotline: 130-9562-2833 (Manager Yu)

 Cement brick manufacturer


Recent browsing:

Copyright © All rights reserved by Pinghu Huafeng Cement Plant